Setup instructions · draft

Set up the station in about 15 minutes.

For the stand team. Items marked TBD or Pending are filled in once we have your machine data and the station is built.

WEIGHTPACKREADYscan your badge1Roll it inone wheeled case2Openeverything is pre-wired3Unfold the tablescale and controls on top4Mast up, power onboots into the game↺ Packs back up in reverse · about 15 min

Roll in and park

Roll the case to its spot, lock the wheels. Needs a floor area of about 2 × 1.5 m and one power socket within 3 m.

Floor space and exact case size: TBD after design freeze (16 Dec)

Photo of this step
after the build

Open and unfold the table

Release the latches, lift the lid off, fold out the table top and lock it.

Photo of the real case: TBD after the build (11 Jan)

Photo of this step
after the build

Raise the screen mast

Pull up the mast, lock it, hang the screen and plug in the one screen cable. Or use the venue screen with an HDMI cable.

Screen size and stand: Pending your choice of kit screen or venue screen

Photo of this step
after the build

Power on

One power cable, main switch on. The PC starts straight into the game; the screen shows READY.

Photo of this step
after the build

Connect to your machine

Plug the network cable (or join the stand network) so the station receives your machine's live fill data.

Pending info from your automation team: PLC model, and an MQTT or OPC UA feed

Photo of this step
after the build

Check the scale

Turn the staff key, place the 500 g check weight, press OK. Takes 30 seconds.

Calibration weight value: TBD once your target weights are confirmed

Photo of this step
after the build

Test round

Play one round yourself. Check the race, the leaderboard, and (Option 2–3) the camera and printer.

Photo of this step
after the build

Open to visitors

Fill the jug, set out bottles, leave the key in "play". One staff member runs the station.

Photo of this step
after the build

Pack up

Export the leads (staff menu), empty the bottles and jug, dry the table, then steps 3 → 1 in reverse.

Where leads are sent: Pending your CRM details (Option 2–3)

Photo of this step
after the build

At a glance

What the station needs

Setup time~15 minutes, one person (target)
Pack-up time~15 minutes
Case size and weightTBD after design freeze
PowerOne 230 V socket · consumption TBD
NetworkPending PLC model and data feed (MQTT or OPC UA)
LiquidWater, about 3 L per show day. Coloured or other liquid: TBD
StaffOne person to run it; key held by staff
ShippingAs freight, or in a van. Wheels and handles on the case